CyrusOne data center in Council Bluffs
CyrusOne data center in Council Bluffs is an operational data center operated by CyrusOne in Council Bluffs, United States. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 12 MW (range 5.8 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,659 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Gifford Road 4700, 51501, Council Bluffs |
| Coordinates | 41.21211, -95.87789 |
| Website | datacentermap.com/usa/iowa/council-bluffs/cyrusone-ocb1 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 161 kV, 1.5 km away (MidAmerican Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 5.4 km away |
| HV substations within 10 km | 23 |
| Utility | Midamerican Energy Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 3.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.8 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 313 g CO₂ per kWh (Iowa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8% |
| Industrial power price | USD 0.093 per kWh (Iowa, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.1 °C (2001 to 2025) |
| Cooling degree days | 707 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.16 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Iowa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne data center in Council Bluffs use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How close is CyrusOne data center in Council Bluffs to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 1.5 km away. The local utility is Midamerican Energy Co, in the MISO balancing area.
How clean is the power for CyrusOne data center in Council Bluffs?
The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.
Who operates CyrusOne data center in Council Bluffs?
CyrusOne.
Data centers near Council Bluffs
- Google Council Bluffs Data Center 1.6 km · 24 MW
- TierPoint Omaha - Bellevue 5.4 km
- Level(3) Bellevue 5.7 km
- Omaha Switch 6.0 km · 0.7 MW
- 1623 Farnam - Omaha 7.1 km · 3 MW
- Google 7.1 km · 31 MW
- Google 7.3 km · 23 MW
- First National Technical Center 7.4 km · 7.2 MW
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.