CyrusOne data center in Council Bluffs is an operational data center operated by CyrusOne in Council Bluffs, United States. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power12 MW (range 5.8 MW to 19 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,659 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressGifford Road 4700, 51501, Council Bluffs
Coordinates41.21211, -95.87789
Websitedatacentermap.com/usa/iowa/council-bluffs/cyrusone-ocb1

Power and grid

Nearest high-voltage substationUnnamed substation, 161 kV, 1.5 km away (MidAmerican Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 345 kV, 5.4 km away
HV substations within 10 km23
UtilityMidamerican Energy Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineNorthern Natural Gas Co, interstate pipeline, 3.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.8 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity313 g CO₂ per kWh (Iowa, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8%
Industrial power priceUSD 0.093 per kWh (Iowa, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.1 °C (2001 to 2025)
Cooling degree days707 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.16 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (Iowa)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CyrusOne data center in Council Bluffs use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

How close is CyrusOne data center in Council Bluffs to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 1.5 km away. The local utility is Midamerican Energy Co, in the MISO balancing area.

How clean is the power for CyrusOne data center in Council Bluffs?

The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.

Who operates CyrusOne data center in Council Bluffs?

CyrusOne.

Data centers near Council Bluffs

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.