Google Council Bluffs Data Center
Google Council Bluffs Data Center is an operational data center operated by Google in Council Bluffs, United States. Our footprint estimate of its power is about 24 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 24 MW (range 9.7 MW to 61 MW) Estimate from building footprint, low confidence. Footprint estimate: about 202,833 m² site outline x 0.12 kW per m² of land. |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 10,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.22196, -95.86429 |
| Website | google.com/about/datacenters/locations/council-bluffs |
Power and grid
| Utility | Midamerican Energy Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 2.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 313 g CO₂ per kWh (Iowa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8% |
| Industrial power price | USD 0.093 per kWh (Iowa, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.1 °C (2001 to 2025) |
| Cooling degree days | 707 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.16 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Iowa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Council Bluffs Data Center use?
We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.
What chips does Google Council Bluffs Data Center use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How clean is the power for Google Council Bluffs Data Center?
The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.
Who operates Google Council Bluffs Data Center?
Google.
Data centers near Council Bluffs
- CyrusOne data center in Council Bluffs 1.6 km · 12 MW
- Omaha Switch 6.1 km · 0.7 MW
- Google 6.9 km · 31 MW
- TierPoint Omaha - Bellevue 7.0 km
- Google 7.1 km · 23 MW
- Level(3) Bellevue 7.2 km
- 1623 Farnam - Omaha 7.3 km · 3 MW
- Google 7.5 km · 12 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States