CyrusOne DUB1
CyrusOne DUB1 is an operational data center operated by CyrusOne in Clondalkin, Ireland. Our footprint estimate of its power is about 37 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 37 MW (range 19 MW to 60 MW) Estimate from building footprint, low confidence. Footprint estimate: about 15,568 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 16,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 53.31666, -6.45622 |
| Website | cyrusone.com/data-centers/europe/ireland/DUB1-Dublin |
Power and grid
| Nearest high-voltage substation | Aungierstown 110 kV Substation, 110 kV, 300 m away (EirGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Castlebaggot 220kV Substation, 220 kV, 400 m away |
| HV substations within 10 km | 32 |
| Power plants within 50 km | 3.5 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne DUB1 use?
We estimate the facility power at about 37 MW. Estimate from building footprint, low confidence.
How close is CyrusOne DUB1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Aungierstown 110 kV Substation (110 kV), about 300 m away.
How clean is the power for CyrusOne DUB1?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Who operates CyrusOne DUB1?
CyrusOne.
Data centers near Clondalkin
- Data center in Clondalkin 210 m · 22 MW
- Data center in Clondalkin 341 m
- Data center in Clondalkin 390 m · 21 MW
- Google 400 m · 29 MW
- Google 672 m · 5.3 MW
- Microsoft DUB14 673 m · 14 MW
- Microsoft DUB13 716 m · 12 MW
- Data center in Clondalkin 795 m · 18 MW
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.