CyrusOne DUB1

CyrusOne DUB1 is an operational data center operated by CyrusOne in Clondalkin, Ireland. Our footprint estimate of its power is about 37 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power37 MW (range 19 MW to 60 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 15,568 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 16,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates53.31666, -6.45622
Websitecyrusone.com/data-centers/europe/ireland/DUB1-Dublin

Power and grid

Nearest high-voltage substationAungierstown 110 kV Substation, 110 kV, 300 m away (EirGrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationCastlebaggot 220kV Substation, 220 kV, 400 m away
HV substations within 10 km32
Power plants within 50 km3.5 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity261 g CO₂ per kWh (Ireland, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8%
Industrial power priceEUR 0.206 per kWh (Ireland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature24.3 °C (2001 to 2025)
Cooling degree days1 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.74 kWh per m² per day
Wind at 50 m8 m/s average
Water stress todayLow (<10%) (Ireland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CyrusOne DUB1 use?

We estimate the facility power at about 37 MW. Estimate from building footprint, low confidence.

How close is CyrusOne DUB1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Aungierstown 110 kV Substation (110 kV), about 300 m away.

How clean is the power for CyrusOne DUB1?

The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.

Who operates CyrusOne DUB1?

CyrusOne.