Microsoft Azure Pioneer-WUS2
Microsoft Azure Pioneer-WUS2 is an operational AI data center operated by Microsoft in East Wenatchee Bench, United States. Its power is about 1.1 MW. Epoch AI estimates about 414 H100-equivalent AI chips (NVIDIA A100).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 1.1 MW Reported (Epoch AI or owner data) |
| AI compute | 414 H100-equivalents |
| AI chips | NVIDIA A100 Reported (Epoch AI or owner data) |
| Chip count | 1,312 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 480 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Washington |
| Coordinates | 48.02501, -120.09429 |
Power and grid
| Nearest high-voltage substation | Chief Joseph Substation, 500 kV, 33.2 km away (Bonneville Power Administration) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Utility | PUD No 1 Of Okanogan County (political subdivision) Electric retail service territory (HIFLD, US government). |
| Balancing authority | DOPD |
| Power plants within 50 km | 3.3 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 6.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.5 °C (2001 to 2025) |
| Cooling degree days | 133 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 3.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Microsoft Azure Pioneer-WUS2 | NVIDIA A100 | 1,312 | 1.1 MW | 2021-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Azure Pioneer-WUS2 use?
Public data puts the facility power at about 1.1 MW. Reported (Epoch AI or owner data).
What chips does Microsoft Azure Pioneer-WUS2 use?
Reported chips: NVIDIA A100.
How close is Microsoft Azure Pioneer-WUS2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Chief Joseph Substation (500 kV), about 33.2 km away. The local utility is PUD No 1 Of Okanogan County, in the DOPD balancing area.
How clean is the power for Microsoft Azure Pioneer-WUS2?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates Microsoft Azure Pioneer-WUS2?
Microsoft.
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.