Data Center Directory

Microsoft Azure Pioneer-WUS2

Microsoft Azure Pioneer-WUS2 is an operational AI data center operated by Microsoft in East Wenatchee Bench, United States. Its power is about 1.1 MW. Epoch AI estimates about 414 H100-equivalent AI chips (NVIDIA A100).

Key facts

StatusOperational
OperatorMicrosoft
Facility power1.1 MW
Reported (Epoch AI or owner data)
AI compute414 H100-equivalents
AI chipsNVIDIA A100
Reported (Epoch AI or owner data)
Chip count1,312
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 480 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWashington
Coordinates48.02501, -120.09429

Power and grid

Nearest high-voltage substationChief Joseph Substation, 500 kV, 33.2 km away (Bonneville Power Administration)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
UtilityPUD No 1 Of Okanogan County (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authorityDOPD
Power plants within 50 km3.3 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity135 g CO₂ per kWh (Washington, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9%
Industrial power priceUSD 0.074 per kWh (Washington, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature6.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.5 °C (2001 to 2025)
Cooling degree days133 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m3.2 m/s average
Water stress todayLow - Medium (10-20%) (Washington)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Microsoft Azure Pioneer-WUS2NVIDIA A1001,3121.1 MW2021-06-01

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Microsoft Azure Pioneer-WUS2 use?

Public data puts the facility power at about 1.1 MW. Reported (Epoch AI or owner data).

What chips does Microsoft Azure Pioneer-WUS2 use?

Reported chips: NVIDIA A100.

How close is Microsoft Azure Pioneer-WUS2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Chief Joseph Substation (500 kV), about 33.2 km away. The local utility is PUD No 1 Of Okanogan County, in the DOPD balancing area.

How clean is the power for Microsoft Azure Pioneer-WUS2?

The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.

Who operates Microsoft Azure Pioneer-WUS2?

Microsoft.

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.