Microsoft Explorer-WUS3 is an operational AI data center operated by Microsoft in Phoenix, United States. Its power is about 2 MW. Epoch AI estimates about 372 H100-equivalent AI chips (AMD Radeon Instinct MI250X).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 2 MW Reported (Epoch AI or owner data) |
| AI compute | 372 H100-equivalents |
| AI chips | AMD Radeon Instinct MI250X Reported (Epoch AI or owner data) |
| Chip count | 1,920 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 850 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Phoenix, Arizona |
| Coordinates | 33.44823, -112.07510 |
Power and grid
| Utility | City Of Mesa (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | WALC |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 48.6 °C (2001 to 2025) |
| Cooling degree days | 2,283 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.8 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Microsoft Explorer-WUS3 | AMD Radeon Instinct MI250X | 1,920 | 2 MW | 2023-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Explorer-WUS3 use?
Public data puts the facility power at about 2 MW. Reported (Epoch AI or owner data).
What chips does Microsoft Explorer-WUS3 use?
Reported chips: AMD Radeon Instinct MI250X.
How clean is the power for Microsoft Explorer-WUS3?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Who operates Microsoft Explorer-WUS3?
Microsoft.
Data centers near Phoenix
- Digital Realty PHX10 (120 E Van Buren) 506 m
- DataBank Phoenix (PHX1) 4.0 km
- Iron Mountain Records Storage 4.4 km · 15 MW
- Data Storage Centers 4.8 km · 3.3 MW
- Lumen Technologies data center in Phoenix 5.0 km · 3.4 MW
- Cogent Data Center 5.9 km · 5.2 MW
- PhoenixNAP 7.1 km · 14 MW
- Stack Infrastructure PHX02 Campus 7.1 km · 27 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.