Microsoft

Microsoft is an operational data center operated by Microsoft in Mucurapo, Trinidad & Tobago. Our footprint estimate of its power is about 0.9 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power0.9 MW (range 0.4 MW to 1.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 742 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 380 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressMucurapo Road, Mucurapo
Coordinates10.67177, -61.53936

Power and grid

Grid carbon intensity679 g CO₂ per kWh (Trinidad & Tobago, 2024)
Average of all power made in the area. Ember.
Grid power mixgas 99.2%. Clean power: 0.4%

Climate and water

Average temperature26.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.9 °C (2001 to 2025)
Cooling degree days3,249 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.32 kWh per m² per day
Wind at 50 m7.6 m/s average
Water stress todayNoData (Port of Spain)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.

Satellite view

Questions

How much power does Microsoft use?

We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.

What chips does Microsoft use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How clean is the power for Microsoft?

The grid in Trinidad & Tobago emits about 679 g CO₂ per kWh (2024). Largest sources: gas 99.2%.

Who operates Microsoft?

Microsoft.

Data centers near Mucurapo

More Microsoft data centers