Microsoft
Microsoft is an operational data center operated by Microsoft in Sandviken, Sweden. Our footprint estimate of its power is about 50 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 50 MW (range 25 MW to 80 MW) Estimate from building footprint, low confidence. Footprint estimate: about 41,709 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 21,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 60.63510, 16.73420 |
Power and grid
| Grid carbon intensity | 36 g CO₂ per kWh (Sweden, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7% |
| Industrial power price | EUR 0.096 per kWh (Sweden, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Water stress today | Low (<10%) (Sweden) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft use?
We estimate the facility power at about 50 MW. Estimate from building footprint, low confidence.
What chips does Microsoft use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft?
The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.
Who operates Microsoft?
Microsoft.
Data centers near Sandviken
- Microsoft 361 m · 79 MW
- Microsoft 15.5 km · 88 MW
- Microsoft 15.9 km · 90 MW
- Microsoft 22.0 km · 94 MW
- GavleNet Operatörshotell 22.8 km
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States