NEXTDC PH1
NEXTDC PH1 is an operational data center operated by NEXTDC in Port Hedland, Australia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | NEXTDC |
| Networks | 1 networks PeeringDB. |
| Address | 17 Loreto Circuit |
| Coordinates | -20.37967, 118.61173 |
| Website | nextdc.com |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Water stress today | Medium - High (20-40%) (Western Australia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for NEXTDC PH1?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates NEXTDC PH1?
NEXTDC.
More NEXTDC data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.