NTT ME Kuramae DC
NTT ME Kuramae DC is an operational data center operated by NTT Global Data Centers in Tokyo, Japan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Address | 1-3-35 Kuramae |
| Coordinates | 35.70095, 139.79179 |
| Website | jp-dc.com/en/housing.html |
Power and grid
| Nearest high-voltage substation | 墨東変電所, 275 kV, 2.6 km away (東京電力パワーグリッド) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 20 |
| Power plants within 50 km | 35 GW in 40 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 872 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.77 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Medium - High (20-40%) (Tokyo) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is NTT ME Kuramae DC to the power grid?
The nearest high-voltage substation in OpenStreetMap is 墨東変電所 (275 kV), about 2.6 km away.
How clean is the power for NTT ME Kuramae DC?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates NTT ME Kuramae DC?
NTT Global Data Centers.
Data centers near Tokyo
- AT TOKYO (CC3) 1.2 km
- NTT ME Kayabakabuto DC 1.6 km
- NTT DOCOMO BUSINESS TK12 - Tokyo 1.7 km
- Digital Edge TYO2 (ComSpace 1) - Tokyo 1.9 km · 0.8 MW
- NTT DOCOMO BUSINESS TK5 - Tokyo 2.1 km
- Digital Edge TYO7 - Tokyo 2.1 km
- Broadband Tower - Monzen-nakacho Bldg. 2.6 km
- NTT DOCOMO BUSINESS TK1 - Tokyo (NTT Otemachi) 2.6 km
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.