NTT Rhein-Ruhr 1 Data Center (CGN1)
NTT Rhein-Ruhr 1 Data Center (CGN1) is an operational data center operated by NTT Global Data Centers in Bonn, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Address | Friedrich-Wöhler Str. 67 |
| Coordinates | 50.74822, 7.07430 |
| Website | datacenter.hello.global.ntt |
Power and grid
| Nearest high-voltage substation | Bonn-Nord (Westnetz GmbH), 110 kV, 800 m away (Westnetz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Station Sechtem, 380 kV, 8.9 km away |
| HV substations within 10 km | 26 |
| Power plants within 50 km | 8.8 GW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 86 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.99 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is NTT Rhein-Ruhr 1 Data Center (CGN1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Bonn-Nord (Westnetz GmbH) (110 kV), about 800 m away.
How clean is the power for NTT Rhein-Ruhr 1 Data Center (CGN1)?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates NTT Rhein-Ruhr 1 Data Center (CGN1)?
NTT Global Data Centers.
Data centers near Bonn
- EXA Edge DC Bonn 828 m
- EnBITCon GmbH 6.7 km
- PlusServer DataCore Köln 18.1 km
- nLighten Cologne CGN1 19.1 km
- Penta Infra Cologne CGN01 21.2 km
- euNetworks Colocation Koeln 22.2 km
- Surfplanet GmbH 25.6 km
- NetCologne data center in Köln 32.1 km · 4.2 MW
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data