STACK Infrastructure data center in Beringen
STACK Infrastructure data center in Beringen is an operational data center operated by STACK Infrastructure in Beringen, Switzerland. Our footprint estimate of its power is about 6.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | STACK Infrastructure |
| Facility power | 6.4 MW (range 3.2 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,346 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Industriestrasse, Beringen |
| Opened | 2027 |
| Coordinates | 47.69312, 8.58455 |
Power and grid
| Grid carbon intensity | 39 g CO₂ per kWh (Switzerland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.5 °C (2001 to 2025) |
| Cooling degree days | 117 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.4 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Schaffhausen) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does STACK Infrastructure data center in Beringen use?
We estimate the facility power at about 6.4 MW. Estimate from building footprint, low confidence.
How clean is the power for STACK Infrastructure data center in Beringen?
The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.
Who operates STACK Infrastructure data center in Beringen?
STACK Infrastructure.
Data centers near Beringen
- Ebnat Schaffhausen 4.5 km
- STACK Infrastructre - ZUR01A 10.7 km · 16 MW
- STACK infrastructure ZUR01 10.8 km
- Hegau Cloud 23.4 km
- AXA Data Center 23.7 km
- NorthC Winterthur (Zürich) 23.7 km
- DataCenter Winterthur 23.8 km
- ZRH1 25.2 km · 4 MW
More STACK Infrastructure data centers
- STACK Infrastructure NVA02 United States
- STACK NVA05B United States
- STACK NVA06 United States
- STACK NVA02E United States
- STACK NVA02x United States
- STACK NVA05A United States
- Stack Infrastructure Portland PORO2 United States
- STACK NVA01A United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.