EdgeConneX Richmond (EDCRIC01)
EdgeConneX Richmond (EDCRIC01) is an operational data center operated by EdgeConneX in Richmond, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Networks | 3 networks, 1 internet exchanges PeeringDB. |
| Address | 1450 E Parham Road |
| Coordinates | 37.63891, -77.46770 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Lakeside Substation, 230 kV, 2.5 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Virginia Natural Gas Co, intrastate pipeline, 400 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.0 GW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.4 °C (2001 to 2025) |
| Cooling degree days | 924 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.27 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is EdgeConneX Richmond (EDCRIC01) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Lakeside Substation (230 kV), about 2.5 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for EdgeConneX Richmond (EDCRIC01)?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates EdgeConneX Richmond (EDCRIC01)?
EdgeConneX.
Data centers near Richmond
- Hosted Backbone Richmond1 2.7 km · 6.8 MW
- DC Blox data center in East Highland Park 5.5 km · 6.3 MW
- Pixel Factory Data Center 7.2 km
- QTS Richmond 2 18.5 km · 252 MW
- QTS Richmond 3 18.5 km · 202 MW
- QTS Richmond - (RIC5) 23.8 km
- White Oak Technology Park 2 23.9 km · 15 MW
- QTS Richmond 1 25.6 km · 333 MW
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
Sources
Correct this page or get the data