Flexential - Salt Lake City/Millcreek (SLC10)
Flexential - Salt Lake City/Millcreek (SLC10) is an operational data center operated by Flexential in Salt Lake City, United States. Our footprint estimate of its power is about 5.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Flexential |
| Facility power | 5.7 MW (range 2.9 MW to 9.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,773 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | Flexential Salt Lake City - Millcreek |
| Address | 3949 S 200 E Ste B1 |
| Coordinates | 40.68549, -111.88506 |
| Website | flexential.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 700 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Mid-Valley Substation, 345 kV, 4.4 km away |
| HV substations within 10 km | 34 |
| Utility | Pacificorp (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PACW, PACE |
| Nearest gas pipeline | Kern River Gas Trans Co, interstate pipeline, 12.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.5 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 620 g CO₂ per kWh (Utah, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 46.9%, gas 30%, solar 17.4%, wind 2.1%, hydro 1.7%. Clean power: 22.6% |
| Industrial power price | USD 0.086 per kWh (Utah, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.1 °C (2001 to 2025) |
| Cooling degree days | 469 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.8 kWh per m² per day |
| Wind at 50 m | 3.7 m/s average |
| Water stress today | High (40-80%) (Utah) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Flexential - Salt Lake City/Millcreek (SLC10) use?
We estimate the facility power at about 5.7 MW. Estimate from building footprint, low confidence.
How close is Flexential - Salt Lake City/Millcreek (SLC10) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 700 m away. The local utility is Pacificorp, in the PACW, PACE balancing area.
How clean is the power for Flexential - Salt Lake City/Millcreek (SLC10)?
The grid in Utah emits about 620 g CO₂ per kWh (2025). Largest sources: coal 46.9%, gas 30%, solar 17.4%.
Who operates Flexential - Salt Lake City/Millcreek (SLC10)?
Flexential.
Data centers near Salt Lake City
- Senawave 7.3 km
- XMission - Salt Lake City - Utah 8.4 km
- Flexential - Salt Lake City/Cottonwood (SLC05) 8.7 km
- UFN Kearns 9.0 km
- DataBank Salt Lake City (SLC1) 9.2 km
- Recursion BioHive-2 9.3 km · 0.7 MW
- EdgeConneX Salt Lake City (EDCSLC01) 9.3 km
- Flexential - Salt Lake City/Fairpark (SLC07) 9.5 km · 1.2 MW
More Flexential data centers
- Douglasville 2 United States
- Flexential - Atlanta/Douglasville (ATL5) United States
- Flexential - Portland/Hillsboro 3 (PDX03) United States
- Flexential - Dallas/Plano (DFW01) United States
- Flexential - Denver/Englewood (DEN11) United States
- Flexential - Portland/Hillsboro 2 (PDX02) United States
- Flexential Dallas - Richardson United States
- Flexential - Portland/Hillsboro 4 (PDX04) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.