Google Council Bluffs (East) is an operational AI data center operated by Google in Council Bluffs, United States. Its power is about 284 MW. Epoch AI estimates about 256,000 H100-equivalent AI chips (TPU v5e, TPU v6e, TPU v5p, TPU v7).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Users | Google DeepMind (speculative) |
| Facility power | 284 MW Reported (Epoch AI or owner data) |
| IT power | 237 MW |
| AI compute | 256,000 H100-equivalents |
| AI chips | TPU v5e, TPU v6e, TPU v5p, TPU v7 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 130,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 9.0 billion Epoch AI estimate, 2025 USD. |
| Address | 10410 Bunge Ave, Council Bluffs, IA 51503 |
| Coordinates | 41.16665, -95.79774 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2022-09-06 | 0 | 0 | Land clearing begins for east buildings |
| 2024-11-19 | 95 MW | 49,000 | Building 1 is operational. Google Earth shows Building 1 had all backup generators and cooling towers installed by the end of August, but construction work was ongoing and there were almost no cars parked. By February 2025, Google Earth shows no construction work and many cars. So our best guess is in the middle, in November 2024. Building 3 roof is complete. |
| 2025-06-15 | 190 MW | 146,000 | Building 2 is operational. Assuming it takes 3 months after generators and cooling towers are finished, similar to Building 1. |
| 2025-07-19 | 190 MW | 146,000 | Land clearing begins in the southwest, suggesting more buildings are planned. |
| 2026-01-11 | 190 MW | 146,000 | Building 3 has all 34 backup generators installed and 4 cooling towers installed, with 3 more cooling towers under construction. There are gaps between cooling towers suggesting that more could be added. Buildings 1 and 2 are running close to full capacity, given that water vapor is coming out of 5 of 7 cooling towers for each building. The land cleared in the southwest appears to be shaped for two more similar buildings, with notches for substations. |
| 2026-07-07 | 284 MW | 256,000 | Building 3 is operational. 7 cooling towers were finally installed despite being more spread out compared to the first two buildings. Cooling towers models vary slightly between buildings. Ground clearing to the southwest seems to be setting up for two more buildings. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-11-19 | TPU v5e | 84,203 | Estimate |
| 2024-11-19 | TPU v6e | 15,419 | Estimate |
| 2024-11-19 | TPU v5p | 38,053 | Estimate |
| 2025-06-15 | TPU v6e | 111,739 | Estimate |
| 2025-06-15 | TPU v5p | 54,261 | Estimate |
| 2026-07-07 | TPU v7 | 41,923 | Estimate |
| 2026-07-07 | TPU v6e | 125,181 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Council Bluffs (East) use?
Public data puts the facility power at about 284 MW. Reported (Epoch AI or owner data).
What chips does Google Council Bluffs (East) use?
Reported chips: TPU v5e, TPU v6e, TPU v5p, TPU v7.
Who operates Google Council Bluffs (East)?
Google. Reported users: Google DeepMind.
Data centers near Council Bluffs
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.