Google The Dalles is an operational AI data center operated by Google in OR, United States. Its power is about 185 MW. Epoch AI estimates about 175,000 H100-equivalent AI chips (TPU v6e, TPU v5p, TPU v5e, TPU v7).

Key facts

StatusOperational
OperatorGoogle
Facility power185 MW
Reported (Epoch AI or owner data)
IT power154 MW
AI compute175,000 H100-equivalents
AI chipsTPU v6e, TPU v5p, TPU v5e, TPU v7
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 86,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 5.8 billion
Epoch AI estimate, 2025 USD.
Address3500 River Rd, The Dalles, OR
Coordinates45.62539, -121.20239

Power and grid

UtilityNorthern Wasco County PUD (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authorityBPAT
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 3.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity200 g CO₂ per kWh (Oregon, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2%
Industrial power priceUSD 0.087 per kWh (Oregon, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature8.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.1 °C (2001 to 2025)
Cooling degree days111 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.21 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayLow - Medium (10-20%) (Oregon)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2023-03-0100Land clearing begins.
2025-03-0793 MW68,000Building 1 is estimated to be operational, based on all external equipment being installed.
2026-04-29185 MW175,000Building 2 is estimated to be operational, based on all external equipment being installed, and ordinary cars parked by the building.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-03-07TPU v6e49,000Estimate
2025-03-07TPU v5p24,736Estimate
2025-03-07TPU v5e54,734Estimate
2026-04-29TPU v5p24,736Estimate
2026-04-29TPU v6e78,028Estimate
2026-04-29TPU v734,648Estimate
2026-04-29TPU v5e54,734Estimate

Satellite view

Questions

How much power does Google The Dalles use?

Public data puts the facility power at about 185 MW. Reported (Epoch AI or owner data).

What chips does Google The Dalles use?

Reported chips: TPU v6e, TPU v5p, TPU v5e, TPU v7.

How clean is the power for Google The Dalles?

The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.

Who operates Google The Dalles?

Google.

Data centers near OR

More Google data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.