Iron Mountain Data Center - Amsterdam (AMS-1)
Iron Mountain Data Center - Amsterdam (AMS-1) is an operational data center operated by Iron Mountain in Amsterdam, Netherlands. Our footprint estimate of its power is about 3.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Iron Mountain |
| Facility power | 3.3 MW (range 1.3 MW to 8.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 27,387 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 176 networks, 10 internet exchanges PeeringDB. |
| Also known as | Iron Mountain AMS1 |
| Address | J.W. Lucasweg 35 |
| Coordinates | 52.39117, 4.66527 |
| Website | ironmountain.com/data-centers/locations/amsterdam-data-center |
Power and grid
| Nearest high-voltage substation | 150 kV Waarderpolder, 150 kV, 300 m away (TenneT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Vijfhuizen, 380 kV, 2.8 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 6.2 GW in 55 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.1 °C (2001 to 2025) |
| Cooling degree days | 39 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 8.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Netherlands) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Iron Mountain Data Center - Amsterdam (AMS-1) use?
We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.
How close is Iron Mountain Data Center - Amsterdam (AMS-1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is 150 kV Waarderpolder (150 kV), about 300 m away.
How clean is the power for Iron Mountain Data Center - Amsterdam (AMS-1)?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates Iron Mountain Data Center - Amsterdam (AMS-1)?
Iron Mountain.
Data centers near Amsterdam
- LeaseWeb AMS-01 72 m
- PhoenixNAP AMSTERDAM 178 m
- Penta Infra Amsterdam AMS01 424 m · 1 MW
- CyrusOne Amsterdam I 2.7 km · 14 MW
- Cogent Amsterdam 3.6 km
- Digital Realty AMS15 - Amsterdam 11.3 km
- Eurofiber Datacenter Amsterdam 1 11.3 km
- Equinix AM8 - Amsterdam, Gyroscoopweg 11.8 km · 1 MW
More Iron Mountain data centers
- Iron Mountain Data Center - New Jersey (NJE-1) United States
- Iron Mountain data center in Sandston United States
- Iron Mountain Data Center - Manassas (VA-1) United States
- Iron Mountain FRA-1 Germany
- Iron Mountain VA-3 United States
- Iron Mountain Data Center - Manassas (VA-2) United States
- Iron Mountain VA-7 United States
- Iron Mountain Data Center - London (LON-1) United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.