CyrusOne Amsterdam I
CyrusOne Amsterdam I is an operational data center operated by CyrusOne in Halfweg, Netherlands. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 14 MW (range 7.2 MW to 23 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,931 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Address | Linieweg 1, 1165 AA Halfweg |
| Opened | 2020 |
| Coordinates | 52.38306, 4.70349 |
| Website | cyrusone.com/locations/amsterdam-one |
Power and grid
| Nearest high-voltage substation | 150 kV Vijfhuizen, 150 kV, 1.1 km away (TenneT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Vijfhuizen, 380 kV, 1.2 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 6.3 GW in 58 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.1 °C (2001 to 2025) |
| Cooling degree days | 39 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 8.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Netherlands) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne Amsterdam I use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How close is CyrusOne Amsterdam I to the power grid?
The nearest high-voltage substation in OpenStreetMap is 150 kV Vijfhuizen (150 kV), about 1.1 km away.
How clean is the power for CyrusOne Amsterdam I?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates CyrusOne Amsterdam I?
CyrusOne.
Data centers near Halfweg
- Cogent Amsterdam 911 m
- Penta Infra Amsterdam AMS01 2.4 km · 1 MW
- Iron Mountain Data Center - Amsterdam (AMS-1) 2.7 km · 3.3 MW
- LeaseWeb AMS-01 2.8 km
- PhoenixNAP AMSTERDAM 2.9 km
- Equinix AM8 - Amsterdam, Gyroscoopweg 9.3 km · 1 MW
- Global Switch Amsterdam 9.5 km · 32 MW
- WideXS - G54 9.6 km
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.