Data Center Directory

Iron Mountain Data Center - Boston (BOS-1)

Iron Mountain Data Center - Boston (BOS-1) is an operational data center operated by Iron Mountain in Northborough, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorIron Mountain
Networks1 networks
PeeringDB.
Address171 Bearfoot Rd
Coordinates42.34062, -71.63981
Websiteironmountain.com/data-centers/locations/boston-data-center

Power and grid

Nearest high-voltage substationNorth Marlboro Substation, 115 kV, 4.1 km away (National Grid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWachusett Substation, 345 kV, 11.4 km away
HV substations within 10 km4
UtilityFitchburg Gas & Elec Light Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityISNE
Nearest gas pipelineTennessee Gas Pipeline, interstate pipeline, 9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.5 GW in 233 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity403 g CO₂ per kWh (Massachusetts, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 65.4%, solar 24.6%, oil and other fossil 4.5%, bioenergy 3.2%, hydro 1.4%. Clean power: 30.1%
Industrial power priceUSD 0.200 per kWh (Massachusetts, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days356 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.81 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayLow - Medium (10-20%) (Massachusetts)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Iron Mountain Data Center - Boston (BOS-1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is North Marlboro Substation (115 kV), about 4.1 km away. The local utility is Fitchburg Gas & Elec Light Co, in the ISNE balancing area.

How clean is the power for Iron Mountain Data Center - Boston (BOS-1)?

The grid in Massachusetts emits about 403 g CO₂ per kWh (2025). Largest sources: gas 65.4%, solar 24.6%, oil and other fossil 4.5%.

Who operates Iron Mountain Data Center - Boston (BOS-1)?

Iron Mountain.

Data centers near Northborough

More Iron Mountain data centers

Sources

Correct this page or get the data