Data Center Directory

Microsoft Datacenter

Microsoft Datacenter is an operational data center operated by Microsoft in Medemblik, Netherlands. Our footprint estimate of its power is about 91 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power91 MW (range 36 MW to 228 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 759,755 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 39,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates52.78304, 5.02535

Power and grid

Grid carbon intensity254 g CO₂ per kWh (Netherlands, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2%
Industrial power priceEUR 0.139 per kWh (Netherlands, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayLow - Medium (10-20%) (Netherlands)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Microsoft Datacenter use?

We estimate the facility power at about 91 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Datacenter use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How clean is the power for Microsoft Datacenter?

The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.

Who operates Microsoft Datacenter?

Microsoft.

Data centers near Medemblik

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.