Microsoft Datacenter West Europe is an operational data center operated by Microsoft in Medemblik, Netherlands. Our footprint estimate of its power is about 33 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 33 MW (range 13 MW to 82 MW) Estimate from building footprint, low confidence. Footprint estimate: about 274,041 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | AMS05 · AMS06 |
| Opened | 2015 |
| Coordinates | 52.76402, 5.03768 |
Power and grid
| Nearest high-voltage substation | 150 kV ECW Wieringermeer, 150 kV, 200 m away (TenneT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Oostzaan, 380 kV, 38.8 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 4.4 GW in 50 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 28.6 °C (2001 to 2025) |
| Cooling degree days | 38 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 8.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Netherlands) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Datacenter West Europe use?
We estimate the facility power at about 33 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Datacenter West Europe use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft Datacenter West Europe to the power grid?
The nearest high-voltage substation in OpenStreetMap is 150 kV ECW Wieringermeer (150 kV), about 200 m away.
How clean is the power for Microsoft Datacenter West Europe?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates Microsoft Datacenter West Europe?
Microsoft.
Data centers near Medemblik
- AMS09 319 m · 11 MW
- AMS07 324 m · 13 MW
- AMS11 384 m · 9.1 MW
- Microsoft Datacenter 1.6 km · 23 MW
- Microsoft Datacenter 2.3 km · 91 MW
- Google Datacenter Middenmeer 3.1 km · 39 MW
- Datacenter Noord-Holland 23.7 km
- KPN Telefoon Centrale 24.7 km
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.