Microsoft MAD02
Microsoft MAD02 is an operational data center operated by Microsoft in San Sebastián de los Reyes, Spain. Our footprint estimate of its power is about 7.6 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 7.6 MW (range 3.8 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,375 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 3,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.54908, -3.61368 |
Power and grid
| Nearest high-voltage substation | SET Arroyo de la Vega, 220 kV, 2 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 13 |
| Power plants within 50 km | 105 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 623 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.7 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft MAD02 use?
We estimate the facility power at about 7.6 MW. Estimate from building footprint, low confidence.
What chips does Microsoft MAD02 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft MAD02 to the power grid?
The nearest high-voltage substation in OpenStreetMap is SET Arroyo de la Vega (220 kV), about 2 km away.
How clean is the power for Microsoft MAD02?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates Microsoft MAD02?
Microsoft.
Data centers near San Sebastián de los Reyes
- Cogent Madrid 2.0 km
- Equinix MD2 - Madrid 3.2 km
- DATA4 Madrid-Alcobendas - MAD1 3.3 km
- DATA4 - MAD1 3.3 km · 6 MW
- CyrusOne Madrid 1 4.1 km
- Equinix MD6 4.4 km · 3 MW
- Acens Technologies 4.7 km
- Equinix MD1 - Madrid 6.3 km
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.