NTT Amsterdam 1 Data Center (AMS 1)
NTT Amsterdam 1 Data Center (AMS 1) is an operational data center operated by NTT Global Data Centers in Rozenburg, Netherlands. Our footprint estimate of its power is about 5.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 5.2 MW (range 2.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 43,312 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks PeeringDB. |
| Also known as | NTT Amsterdam 1 Data Center |
| Address | Aviolanda 1 |
| Opened | 2020 |
| Coordinates | 52.28375, 4.74442 |
| Website | datacenter.hello.global.ntt/en/location/netherlands/amsterdam-1-data-center |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 150 kV, 1.1 km away (EdgeConnex) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV-opstijgpunt Cruquius, 380 kV, 7.9 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 5.6 GW in 60 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.1 °C (2001 to 2025) |
| Cooling degree days | 39 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 8.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Netherlands) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT Amsterdam 1 Data Center (AMS 1) use?
We estimate the facility power at about 5.2 MW. Estimate from building footprint, low confidence.
How close is NTT Amsterdam 1 Data Center (AMS 1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (150 kV), about 1.1 km away.
How clean is the power for NTT Amsterdam 1 Data Center (AMS 1)?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates NTT Amsterdam 1 Data Center (AMS 1)?
NTT Global Data Centers.
Data centers near Rozenburg
- EdgeConneX AMS06 179 m · 6.5 MW
- Digital Realty data center in Aalsmeer 783 m · 13 MW
- Digital Realty AMS8 805 m
- nLighten Amsterdam AMS2 936 m
- Digital Realty AMS11 - Amsterdam 1.4 km · 18 MW
- Digital Realty data center in Oosteinde 1.4 km · 22 MW
- EdgeConneX data center in Oosteinde 1.5 km · 6.9 MW
- EdgeConneX data center in Oosteinde 1.6 km · 14 MW
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.