NTT Amsterdam 1 Data Center (AMS 1) is an operational data center operated by NTT Global Data Centers in Rozenburg, Netherlands. Our footprint estimate of its power is about 5.2 MW.

Key facts

StatusOperational
OperatorNTT Global Data Centers
Facility power5.2 MW (range 2.1 MW to 13 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 43,312 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 2,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks4 networks
PeeringDB.
Also known asNTT Amsterdam 1 Data Center
AddressAviolanda 1
Opened2020
Coordinates52.28375, 4.74442
Websitedatacenter.hello.global.ntt/en/location/netherlands/amsterdam-1-data-center

Power and grid

Nearest high-voltage substationUnnamed substation, 150 kV, 1.1 km away (EdgeConnex)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation380 kV-opstijgpunt Cruquius, 380 kV, 7.9 km away
HV substations within 10 km9
Power plants within 50 km5.6 GW in 60 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity254 g CO₂ per kWh (Netherlands, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2%
Industrial power priceEUR 0.139 per kWh (Netherlands, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature11.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature29.1 °C (2001 to 2025)
Cooling degree days39 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.97 kWh per m² per day
Wind at 50 m8.2 m/s average
Water stress todayLow - Medium (10-20%) (Netherlands)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NTT Amsterdam 1 Data Center (AMS 1) use?

We estimate the facility power at about 5.2 MW. Estimate from building footprint, low confidence.

How close is NTT Amsterdam 1 Data Center (AMS 1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (150 kV), about 1.1 km away.

How clean is the power for NTT Amsterdam 1 Data Center (AMS 1)?

The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.

Who operates NTT Amsterdam 1 Data Center (AMS 1)?

NTT Global Data Centers.

Data centers near Rozenburg

More NTT Global Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.