NTT Bangkok 2 Data Center (BKK2)

NTT Bangkok 2 Data Center (BKK2) is an operational data center operated by NTT Global Data Centers in Chon Buri, Thailand. Our footprint estimate of its power is about 5.7 MW.

Key facts

StatusOperational
OperatorNTT Global Data Centers
Facility power5.7 MW (range 2.8 MW to 9.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,732 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks12 networks, 2 internet exchanges
PeeringDB.
Also known asNTT BKK2 Data Center
Address700/86 Soi Amata Nakorn Industrial, Ban Kao, Phan Thong District
Coordinates13.44302, 101.04926
Websiteservices.global.ntt/en-us/services-and-products/global-data-centers/global-locations/asia-pacific/bangkok-2-data-center

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 800 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationสถานีไฟฟ้าแรงสูงพานทอง, 230 kV, 1.9 km away
HV substations within 10 km19
Power plants within 50 km6.9 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity526 g CO₂ per kWh (Thailand, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 61.5%, coal 16.7%, bioenergy 11%, solar 5%, hydro 3.9%. Clean power: 21.7%

Climate and water

Average temperature27.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42 °C (2001 to 2025)
Cooling degree days3,447 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.96 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayExtremely High (>80%) (Chon Buri)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NTT Bangkok 2 Data Center (BKK2) use?

We estimate the facility power at about 5.7 MW. Estimate from building footprint, low confidence.

How close is NTT Bangkok 2 Data Center (BKK2) to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 800 m away.

How clean is the power for NTT Bangkok 2 Data Center (BKK2)?

The grid in Thailand emits about 526 g CO₂ per kWh (2025). Largest sources: gas 61.5%, coal 16.7%, bioenergy 11%.

Who operates NTT Bangkok 2 Data Center (BKK2)?

NTT Global Data Centers.

Data centers near Chon Buri

More NTT Global Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.