NTT Bangkok 2 Data Center (BKK2)
NTT Bangkok 2 Data Center (BKK2) is an operational data center operated by NTT Global Data Centers in Chon Buri, Thailand. Our footprint estimate of its power is about 5.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 5.7 MW (range 2.8 MW to 9.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,732 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 12 networks, 2 internet exchanges PeeringDB. |
| Also known as | NTT BKK2 Data Center |
| Address | 700/86 Soi Amata Nakorn Industrial, Ban Kao, Phan Thong District |
| Coordinates | 13.44302, 101.04926 |
| Website | services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/asia-pacific/bangkok-2-data-center |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 800 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | สถานีไฟฟ้าแรงสูงพานทอง, 230 kV, 1.9 km away |
| HV substations within 10 km | 19 |
| Power plants within 50 km | 6.9 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 526 g CO₂ per kWh (Thailand, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 61.5%, coal 16.7%, bioenergy 11%, solar 5%, hydro 3.9%. Clean power: 21.7% |
Climate and water
| Average temperature | 27.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42 °C (2001 to 2025) |
| Cooling degree days | 3,447 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.96 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Extremely High (>80%) (Chon Buri) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT Bangkok 2 Data Center (BKK2) use?
We estimate the facility power at about 5.7 MW. Estimate from building footprint, low confidence.
How close is NTT Bangkok 2 Data Center (BKK2) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 800 m away.
How clean is the power for NTT Bangkok 2 Data Center (BKK2)?
The grid in Thailand emits about 526 g CO₂ per kWh (2025). Largest sources: gas 61.5%, coal 16.7%, bioenergy 11%.
Who operates NTT Bangkok 2 Data Center (BKK2)?
NTT Global Data Centers.
Data centers near Chon Buri
- GSA DATA CENTER 02 4.9 km
- Arise IDC - Bangkok East 1, Thailand 29.9 km
- BKK01 34.5 km
- ETIX Bangkok #1 34.7 km
- China Mobile International - Data Zone Data Center (Thailand) 39.2 km
- NTT Bangkok 1 Data Center (BKK1) 49.5 km
- TCC Technology Data Center- Bangkok,Thailand (TCC BNDC,TCC Bangna,TCCtech) 49.5 km
- GreenNode Bangkok Cluster 56.0 km · 1.5 MW
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.