NTT DOCOMO BUSINESS TK6 - Tokyo is an operational data center operated by NTT Global Data Centers in Tokyo, Japan. Our footprint estimate of its power is about 0.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 0.9 MW (range 0.4 MW to 2.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,307 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 380 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | 東京第6データセンター |
| Address | 2-7-5 Tabatashinmachi, Kita-ku |
| Coordinates | 35.73939, 139.76668 |
| Website | ntt.com/en/services/data-center/nexcenter.html |
Power and grid
| Nearest high-voltage substation | 田端変電所, 154 kV, 800 m away (東京電力パワーグリッド) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 上野変電所, 275 kV, 2.5 km away |
| HV substations within 10 km | 17 |
| Power plants within 50 km | 35 GW in 40 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 872 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.77 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Medium - High (20-40%) (Tokyo) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT DOCOMO BUSINESS TK6 - Tokyo use?
We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.
How close is NTT DOCOMO BUSINESS TK6 - Tokyo to the power grid?
The nearest high-voltage substation in OpenStreetMap is 田端変電所 (154 kV), about 800 m away.
How clean is the power for NTT DOCOMO BUSINESS TK6 - Tokyo?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates NTT DOCOMO BUSINESS TK6 - Tokyo?
NTT Global Data Centers.
Data centers near Tokyo
- University of Tokyo Wisteria/BDEC-01 (Aquarius) 3.2 km · 0.3 MW
- NTT DOCOMO BUSINESS TK5 - Tokyo 3.8 km
- Equinix TY10 - Tokyo 4.0 km
- NTT DOCOMO BUSINESS TK12 - Tokyo 4.4 km
- NTT ME Ikebukuro DC 4.4 km
- Digital Edge TYO1 (MDC) - Tokyo 4.5 km
- KDDI 4.6 km
- NTT ME Kuramae DC 4.8 km
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.