Key facts

StatusOperational
OperatorNTT Global Data Centers
Facility power0.9 MW (range 0.4 MW to 2.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 7,307 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 380 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known as東京第6データセンター
Address2-7-5 Tabatashinmachi, Kita-ku
Coordinates35.73939, 139.76668
Websitentt.com/en/services/data-center/nexcenter.html

Power and grid

Nearest high-voltage substation田端変電所, 154 kV, 800 m away (東京電力パワーグリッド)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation上野変電所, 275 kV, 2.5 km away
HV substations within 10 km17
Power plants within 50 km35 GW in 40 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity474 g CO₂ per kWh (Japan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33%

Climate and water

Average temperature15.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.7 °C (2001 to 2025)
Cooling degree days872 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.77 kWh per m² per day
Wind at 50 m5.9 m/s average
Water stress todayMedium - High (20-40%) (Tokyo)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NTT DOCOMO BUSINESS TK6 - Tokyo use?

We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.

How close is NTT DOCOMO BUSINESS TK6 - Tokyo to the power grid?

The nearest high-voltage substation in OpenStreetMap is 田端変電所 (154 kV), about 800 m away.

How clean is the power for NTT DOCOMO BUSINESS TK6 - Tokyo?

The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.

Who operates NTT DOCOMO BUSINESS TK6 - Tokyo?

NTT Global Data Centers.

Data centers near Tokyo

More NTT Global Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.