NTT
NTT is an operational data center operated by NTT Global Data Centers in Kādiganahalli, India. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Coordinates | 13.19304, 77.64161 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 220 kV, 4.1 km away (KPTCL) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 370 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 666 g CO₂ per kWh (India, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 70%, solar 9.8%, hydro 8.5%, wind 5%, nuclear 2.6%. Clean power: 27.1% |
Climate and water
| Average temperature | 23.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.4 °C (2001 to 2025) |
| Cooling degree days | 2,222 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.61 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | High (40-80%) (Karnataka) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is NTT to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (220 kV), about 4.1 km away.
How clean is the power for NTT?
The grid in India emits about 666 g CO₂ per kWh (2025). Largest sources: coal 70%, solar 9.8%, hydro 8.5%.
Who operates NTT?
NTT Global Data Centers.
Data centers near Kādiganahalli
- Reliance Communications Internet Data Center 20.6 km · 2 MW
- Netmagic Bangalore DC03 21.3 km · 1.5 MW
- CtrlS Bangalore DC1 23.2 km
- DV-IDC-BAN01 23.7 km
- City Online Services Ltd , Bengaluru 23.9 km
- Bell Teleservices India Pvt Ltd 24.5 km
- Infynix Bengaluru 24.6 km
- STTelemedia Global Data Centeres 25.0 km · 45 MW
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.