NTT Madrid 1 Data Center (MAD1)
NTT Madrid 1 Data Center (MAD1) is an operational data center operated by NTT Global Data Centers in Las Rozas de Madrid, Spain. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Networks | 2 networks PeeringDB. |
| Address | Calle Aquisgran 2, 28232 las Rozas de Madrid |
| Coordinates | 40.49983, -3.89036 |
| Website | datacenter.hello.global.ntt/en/location/madrid/madrid-1-data-center |
Power and grid
| Nearest high-voltage substation | Subestación de Las Rozas, 132 kV, 700 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación Valle del Arcipreste, 220 kV, 1.4 km away |
| HV substations within 10 km | 5 |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 623 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.7 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is NTT Madrid 1 Data Center (MAD1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación de Las Rozas (132 kV), about 700 m away.
How clean is the power for NTT Madrid 1 Data Center (MAD1)?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates NTT Madrid 1 Data Center (MAD1)?
NTT Global Data Centers.
Data centers near Las Rozas de Madrid
- Espacio Rack 14.0 km
- nLighten Madrid MAD1 16.9 km
- Ibercom Madrid 18.4 km
- Secretaría General Adjunta de Informática 18.4 km
- Equinix MD1 - Madrid 18.5 km
- Vozelia Telecom Madrid 18.9 km
- Templus DC Madrid MAD02 19.1 km
- Acens Technologies 19.6 km
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data