Amazon AWS SAT - 12807 Donop is an operational data center operated by Amazon Web Services in San Antonio, United States. Our footprint estimate of its power is about 23 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Key facts

StatusOperational
OperatorAmazon Web Services
Facility power23 MW (range 11 MW to 36 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 18,775 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 9,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates29.29301, -98.39160

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 200 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationArthur Von Rosenberg Switchyard, 345 kV, 3.9 km away
HV substations within 10 km15
UtilityBandera Electric Coop, INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineEl Paso Texas Pipeline Co, intrastate pipeline, 1.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km6.5 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature20.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.5 °C (2001 to 2025)
Cooling degree days1,804 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.84 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Amazon AWS SAT - 12807 Donop use?

We estimate the facility power at about 23 MW. Estimate from building footprint, low confidence.

What chips does Amazon AWS SAT - 12807 Donop use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

How close is Amazon AWS SAT - 12807 Donop to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 200 m away. The local utility is Bandera Electric Coop, INC, in the ERCO balancing area.

How clean is the power for Amazon AWS SAT - 12807 Donop?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates Amazon AWS SAT - 12807 Donop?

Amazon Web Services.

Data centers near San Antonio

More Amazon Web Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.