Centersquare Denver (DEN1)
Centersquare Denver (DEN1) is an operational data center operated by Centersquare in Highlands Ranch, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Centersquare |
| Networks | 8 networks, 2 internet exchanges PeeringDB. |
| Address | 9180 Commerce Center Circle |
| Coordinates | 39.55022, -105.03337 |
| Website | centersquaredc.com/data-centers/denver |
Power and grid
| Nearest high-voltage substation | Santa Fe Substation, 230 kV, 700 m away (Public Service Company of Colorado) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Utility | Public Service Co Of Colorado (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PSCO |
| Nearest gas pipeline | Colorado Interstate Gas Co, interstate pipeline, 5.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.6 GW in 46 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 400 g CO₂ per kWh (Colorado, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6% |
| Industrial power price | USD 0.100 per kWh (Colorado, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.1 °C (2001 to 2025) |
| Cooling degree days | 315 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.85 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Extremely High (>80%) (Colorado) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Centersquare Denver (DEN1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Santa Fe Substation (230 kV), about 700 m away. The local utility is Public Service Co Of Colorado, in the PSCO balancing area.
How clean is the power for Centersquare Denver (DEN1)?
The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.
Who operates Centersquare Denver (DEN1)?
Centersquare.
Data centers near Highlands Ranch
- Verizon 14.0 km · 0.7 MW
- H5 Data Centers Denver 14.3 km
- DataBank Denver (DEN1) 14.4 km · 1.3 MW
- Equinix DE1 - Denver 15.0 km
- Equinix DE2 - Denver 15.1 km
- Time Warner Datacenter 15.8 km · 5.3 MW
- DataBank Denver (DEN2) 16.6 km · 9.2 MW
- Flexential - Denver/Englewood (DEN11) 16.7 km · 24 MW
More Centersquare data centers
- Centersquare Dallas (DFW1) United States
- Centersquare Chicago (ORD2) United States
- Centersquare Atlanta (ATL1-A/B/C) United States
- Centersquare Chicago (ORD4) United States
- Centersquare Northern Virginia (IAD4) United States
- Centersquare New Jersey (EWR5) United States
- Centersquare Northern Virginia (IAD1-C/E) United States
- Centersquare Seattle (SEA1-B) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.