NTT Chicago CH4
NTT Chicago CH4 is an operational data center operated by NTT Global Data Centers in Itasca, United States. Our footprint estimate of its power is about 9.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 9.4 MW (range 4.7 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,835 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Arlington Heights Road 1200, 60143, Itasca |
| Coordinates | 41.98910, -88.00476 |
| Website | services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/chicago-ch1-data-center |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 345 kV, 1.3 km away (Commonwealth Edison) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 13 |
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Natural Gas PL Co of Am, interstate pipeline, 2.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.7 GW in 31 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.5 °C (2001 to 2025) |
| Cooling degree days | 465 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT Chicago CH4 use?
We estimate the facility power at about 9.4 MW. Estimate from building footprint, low confidence.
How close is NTT Chicago CH4 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (345 kV), about 1.3 km away. The local utility is Commonwealth Edison Co, in the PJM balancing area.
How clean is the power for NTT Chicago CH4?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates NTT Chicago CH4?
NTT Global Data Centers.
Data centers near Itasca
- NTT Chicago CH3 359 m · 15 MW
- RagingWire CH1 - NTT 740 m
- Skybox Chicago I 2.6 km · 50 MW
- Digital Realty CH3 - Chicago 3.4 km · 35 MW
- Element Critical Chicago CH2 3.5 km · 7.8 MW
- Digital Realty CH1 - Chicago 3.6 km · 149 MW
- Element Critical Chicago CH1 3.6 km · 17 MW
- CyrusOne CHI6 3.7 km · 4.8 MW
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.