Google Lancaster
Google Lancaster is an operational AI data center operated by Google in Lancaster, United States. Its power is about 164 MW. Epoch AI estimates about 130,000 H100-equivalent AI chips (TPU v5e, TPU v6e).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 164 MW Reported (Epoch AI or owner data) |
| IT power | 137 MW |
| AI compute | 130,000 H100-equivalents |
| AI chips | TPU v5e, TPU v6e Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 76,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 5.2 billion Epoch AI estimate, 2025 USD. |
| Address | 105 Whiley Rd, Lancaster, OH 43130 |
| Coordinates | 39.72704, -82.68314 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2021-10-01 | 0 | 0 | Land clearing in progress for the site |
| 2024-01-01 | 82 MW | 35,000 | Building 1 operational. This is estimated based on construction progress in [October 2023](https://earth.google.com/web/@39.72490515,-82.68845499,280.4138206a,1128.806013d,35y,-0h,0t,0r/data=CnUaXRJXCiUweDg4NDc4OWI3MDRhZGE1MWQ6MHg0Y2Q1MjE2ZGM0YTQ0YTc5GSZeVEH73ENAISDkBo2qq1TAKhwxMDQgV2hpbGV5IFJkLCBMYW5jYXN0ZXIsIE9IGAIgASoQCAESCjIwMjMtMDUtMTAYAUICCAFCAggASg0I____________ARAA). This also corresponds to a [2023 article](https://ohiocapitaljournal.com/2023/08/29/google-announces-plans-to-invest-1-7-billion-in-a-trio-of-central-ohio-data-centers/) where a Google spokesperson says that the "the Lancaster data center will open later this year". |
| 2025-09-11 | 82 MW | 35,000 | Building 2 is close to completion. Structurally it is already complete, but there is still some equipment strewn around the building that suggests commissioning is ongoing. |
| 2025-10-31 | 164 MW | 130,000 | Building 2 operational. This is supported by the state of Building 2 a month prior, which is entirely complete outside of some equipment that was removed later on. |
| 2026-03-12 | 164 MW | 130,000 | At this point, Building 1 and 2 have since already been operational. Additionally, there is visible steam showing clear evidence of operational for both before this date. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-01-01 | TPU v5e | 174,561 | Estimate |
| 2025-10-31 | TPU v6e | 103,359 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Lancaster use?
Public data puts the facility power at about 164 MW. Reported (Epoch AI or owner data).
What chips does Google Lancaster use?
Reported chips: TPU v5e, TPU v6e.
Who operates Google Lancaster?
Google.
Data centers near Lancaster
- Google 498 m · 31 MW
- Google 759 m · 31 MW
- Google Lockbourne, OH 30.0 km · 111 MW
- Google 30.0 km · 26 MW
- Google Columbus 31.2 km · 364 MW
- Bresco Broadband Data Center 36.7 km
- Quality Technology Data Center 37.0 km · 15 MW
- Google NBY-7 37.0 km · 29 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.