Level(3) Chicago (Kingsbury)

Level(3) Chicago (Kingsbury) is an operational data center operated by Lumen Technologies in Chicago, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorLumen Technologies
Networks15 networks
PeeringDB.
Address900 N Kingsbury St
Coordinates41.89895, -87.64464
Websitelevel3.com

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 300 m away (Commonwealth Edison)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationComEd 138kV-345kV West Loop Substation, 345 kV, 800 m away
HV substations within 10 km27
UtilityCommonwealth Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineNatural Gas PL Co of Am, interstate pipeline, 9.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.1 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity247 g CO₂ per kWh (Illinois, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3%
Industrial power priceUSD 0.113 per kWh (Illinois, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.7 °C (2001 to 2025)
Cooling degree days362 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m7.3 m/s average
Water stress todayMedium - High (20-40%) (Illinois)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Level(3) Chicago (Kingsbury) to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 300 m away. The local utility is Commonwealth Edison Co, in the PJM balancing area.

How clean is the power for Level(3) Chicago (Kingsbury)?

The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.

Who operates Level(3) Chicago (Kingsbury)?

Lumen Technologies.