Data Center Directory

Microsoft

Microsoft is an operational data center operated by Microsoft in Aldie, United States. Our footprint estimate of its power is about 15 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power15 MW (range 6.1 MW to 38 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 126,991 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 6,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asAmazon IAD-127 · Amazon IAD-126 · Amazon IAD-124 · Amazon IAD-125
AddressQuail Ridge Lane 24214;24224;24234;24244;24254;24258, 20105, Aldie
Coordinates38.94952, -77.55945

Satellite view

Questions

How much power does Microsoft use?

We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.

What chips does Microsoft use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Microsoft?

Microsoft.

Data centers near Aldie

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.