Google Arcola Building 3 is an operational data center operated by Google in Sterling, United States. Our footprint estimate of its power is about 61 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 61 MW (range 30 MW to 97 MW) Estimate from building footprint, low confidence. Footprint estimate: about 50,660 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 26,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Howling Rooster Lane 24555, 20166, Sterling |
| Coordinates | 38.94163, -77.53190 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 400 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 45 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Cove Point Pipeline, interstate pipeline, 100 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.0 GW in 33 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Arcola Building 3 use?
We estimate the facility power at about 61 MW. Estimate from building footprint, low confidence.
What chips does Google Arcola Building 3 use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How close is Google Arcola Building 3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 400 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Google Arcola Building 3?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Google Arcola Building 3?
Google.
Data centers near Sterling
- Google Data Center 531 m · 45 MW
- Amazon Fadeley III 1.2 km · 22 MW
- Tech Park at Brambleton 1.7 km · 27 MW
- Yondr Allegro South 1.8 km · 60 MW
- Arcola Tech Park 2.2 km · 33 MW
- Microsoft 2.5 km · 15 MW
- CyrusOne Sterling NVA9 2.9 km · 49 MW
- CyrusOne NVA9 3.2 km · 15 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.