Microsoft JKT09

Microsoft JKT09 is an operational data center operated by Microsoft in Karawang, Indonesia. Our footprint estimate of its power is about 10 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power10 MW (range 5.2 MW to 17 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,728 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 4,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-6.37774, 107.25202

Power and grid

Grid carbon intensity705 g CO₂ per kWh (Indonesia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8%

Climate and water

Water stress todayMedium - High (20-40%) (Indonesia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Microsoft JKT09 use?

We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.

What chips does Microsoft JKT09 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How clean is the power for Microsoft JKT09?

The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.

Who operates Microsoft JKT09?

Microsoft.

Data centers near Karawang

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.