Microsoft JKT09
Microsoft JKT09 is an operational data center operated by Microsoft in Karawang, Indonesia. Our footprint estimate of its power is about 10 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 10 MW (range 5.2 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,728 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -6.37774, 107.25202 |
Power and grid
| Grid carbon intensity | 705 g CO₂ per kWh (Indonesia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8% |
Climate and water
| Water stress today | Medium - High (20-40%) (Indonesia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft JKT09 use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
What chips does Microsoft JKT09 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft JKT09?
The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.
Who operates Microsoft JKT09?
Microsoft.
Data centers near Karawang
- Amazon Web Services 691 m · 8.4 MW
- Microsoft JKT02 1.8 km · 15 MW
- DCI Indonesia (H2-01) 3.0 km
- DCI Indonesia H2-02 3.4 km · 80 MW
- STTGDC JKT1 5.6 km
- STT Jakarta 1 5.6 km · 22 MW
- DIgital Edge CGK Campus 6.3 km
- Microsoft JKT05 6.6 km · 14 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States