Microsoft Roskilde
Microsoft Roskilde is an operational data center operated by Microsoft in Tune, Denmark. Our footprint estimate of its power is about 18 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 18 MW (range 7.2 MW to 45 MW) Estimate from building footprint, low confidence. Footprint estimate: about 150,874 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | CPH01 |
| Coordinates | 55.58070, 12.10019 |
Power and grid
| Grid carbon intensity | 120 g CO₂ per kWh (Denmark, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 56.9%, bioenergy 21.4%, solar 12.8%, oil and other fossil 4.9%, coal 2.5%. Clean power: 91.2% |
| Industrial power price | EUR 0.118 per kWh (Denmark, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.9 °C (2001 to 2025) |
| Cooling degree days | 44 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.91 kWh per m² per day |
| Wind at 50 m | 7.7 m/s average |
| Water stress today | Low (<10%) (Denmark) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Roskilde use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Roskilde use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft Roskilde?
The grid in Denmark emits about 120 g CO₂ per kWh (2025). Largest sources: wind 56.9%, bioenergy 21.4%, solar 12.8%.
Who operates Microsoft Roskilde?
Microsoft.
Data centers near Tune
- CPH07 12.2 km · 21 MW
- GlobalConnect Taastrup 1 (CPH1) 15.5 km · 5.4 MW
- GlobalConnect Taastrup 2 15.9 km
- Cibicom Datacenter CPH West 17.4 km
- GlobalConnect Albertslund (CPH3) 19.3 km
- Adeo Datacenter 19.4 km · 4.1 MW
- Norlys Telehouse Copenhagen 19.6 km
- Penta Infra Copenhagen CPH01 21.7 km
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.