Data Center Directory

NTT Frankfurt 4 Data Center (FRA4)

NTT Frankfurt 4 Data Center (FRA4) is an operational data center operated by NTT Global Data Centers in Hattersheim am Main, Germany. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatorNTT Global Data Centers
Facility power11 MW (range 4.3 MW to 27 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 88,924 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks3 networks, 1 internet exchanges
PeeringDB.
Also known asNTT Global Datacenters Frankfurt 4
AddressVoltastrasse 15
Coordinates50.06387, 8.48535
Websitedatacenter.hello.global.ntt/en/location/frankfurt/frankfurt-4-data-center

Power and grid

Nearest high-voltage substationUmspannwerk Hattersheim, 110 kV, 1.7 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationKabeleinführung 380 kV, 380 kV, 3 km away
HV substations within 10 km23
Power plants within 50 km3.3 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.8 °C (2001 to 2025)
Cooling degree days233 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.98 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NTT Frankfurt 4 Data Center (FRA4) use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is NTT Frankfurt 4 Data Center (FRA4) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Umspannwerk Hattersheim (110 kV), about 1.7 km away.

How clean is the power for NTT Frankfurt 4 Data Center (FRA4)?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates NTT Frankfurt 4 Data Center (FRA4)?

NTT Global Data Centers.

Data centers near Hattersheim am Main

More NTT Global Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.