NTT
NTT is an operational data center operated by NTT Global Data Centers in Plano, United States. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 17 MW (range 8.7 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,492 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 32.98093, -96.65947 |
Power and grid
| Utility | City Of Garland (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Energy Transfer, intrastate pipeline, 19 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.7 °C (2001 to 2025) |
| Cooling degree days | 1,494 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.64 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
How clean is the power for NTT?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates NTT?
NTT Global Data Centers.
Data centers near Plano
- RagingWire TX1 - NTT 156 m · 17 MW
- NTT 288 m · 20 MW
- Stream Data Centers - DFW VII 450 m · 27 MW
- Digital Realty 1.1 km · 23 MW
- Stream DFW IV 2.1 km · 1.7 MW
- Aligned Data Centers DFW-04 2.8 km · 18 MW
- Flexential - Dallas/Plano (DFW01) 3.0 km · 27 MW
- Aligned DFW-02 3.4 km · 7.6 MW
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.