Google Arcola
Google Arcola is an operational AI data center operated by Google in Sterling, United States. Its power is about 93 MW. Epoch AI estimates about 108,000 H100-equivalent AI chips (TPU v6e, TPU v7).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 93 MW Reported (Epoch AI or owner data) |
| IT power | 77 MW |
| AI compute | 108,000 H100-equivalents |
| AI chips | TPU v6e, TPU v7 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 43,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 2.9 billion Epoch AI estimate, 2025 USD. |
| Address | 42575 Arcola Blvd, Sterling, VA 20166 |
| Coordinates | 39.00175, -77.40333 (city level) |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-10-01 | 0 | 0 | Building 1 foundation started |
| 2025-09-08 | 0 | 0 | Building 1 roof complete, cooling towers in progress. |
| 2026-04-09 | 0 | 0 | Building 1 appears almost complete, with minimal construction activity. |
| 2026-06-16 | 93 MW | 108,000 | Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-06-16 | TPU v6e | 13,171 | Estimate |
| 2026-06-16 | TPU v7 | 41,079 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Arcola use?
Public data puts the facility power at about 93 MW. Reported (Epoch AI or owner data).
What chips does Google Arcola use?
Reported chips: TPU v6e, TPU v7.
How clean is the power for Google Arcola?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Google Arcola?
Google.
Data centers near Sterling
- Amazon IAD-92 1.8 km · 36 MW
- CyrusOne NVA8 2.3 km · 31 MW
- Vantage VA2 2.4 km · 125 MW
- EdgeCore VA1 2.4 km · 94 MW
- Amazon IAD-141 2.4 km · 68 MW
- Centersquare Northern Virginia (IAD1-A/F) 2.5 km · 16 MW
- Amazon IAD-128 2.6 km · 19 MW
- Centersquare Northern Virginia (IAD2) 2.6 km · 18 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.